
- Period2011~2013, 3 times in total.
- Project organizerGreen Innovation Center of Small & Medium business belong to SMBA and GGGI
-
Contents2011 – Manufactured 20 sets of solar cooker
–2012 – Manufactured solar cooker(SK-14, 100sets), installed 5kW solar power generator
–2013 – Scheffler reflector(10sq 3sets) Transferred technology to the local team and led manufacturing and installation - Resultsormed ECO solar, a local team of solar engineers